Disabling temperature compensation on a NetSure plant

Short answer

This is one of the two settings that most often makes a lithium retrofit misbehave. It is also one of the quickest to fix — if the firmware lets you.

Key figures at a glance

ParameterValueWhere it comes from
Temperature compensation sensor Set to None — not merely unplugged Plant maker's lithium application guidance
Automatic equalize Per application — lithium is not equalized Plant maker's lithium application guidance
Battery thermal runaway management (BTRM) Off — thermal protection belongs to the BMS Plant maker's lithium application guidance
String capacity entered as Ah × number of modules Plant maker's lithium application guidance
Charge current limit above 0.25C Requires a minimum NCU firmware version Controller firmware condition
Module default voltage and walk-in Require a later firmware version again Controller firmware condition
Plant low-voltage disconnect ≥ battery LVD + 0.5 V Plant maker's lithium application guidance

Why it has to go

Temperature compensation exists because lead-acid batteries need a different charge voltage hot than cold, so the plant raises and lowers the bus with the battery temperature sensor. A LiFePO4 pack has a BMS that manages its own cells and does not want the bus moving underneath it. Leaving compensation enabled on a lithium retrofit means the plant is applying a correction curve for a chemistry that is no longer installed.

The setting itself

On a NetSure plant the controller is normally an NCU, and the parameter is the temperature compensation sensor selection — it has to be set to None rather than merely unplugging the probe. Alongside it, automatic equalize should be set according to the application rather than left on a lead-acid cycle, because lithium is not equalized at all.

The setting nobody remembers: thermal runaway management

NetSure plants also carry a battery thermal runaway management function (BTRM). On a lithium installation it should be off: thermal protection belongs to the BMS, which measures cells directly, not to a plant controller inferring from a string-level sensor. Two controllers fighting over the same protection is worse than either one alone.

The firmware condition

Firmware version is a condition of entry, not a footnote. On NCU controllers, setting a charge current limit above 0.25C requires a minimum firmware version, and adjusting the module default voltage and walk-in requires a later one again. If the plant is below the threshold, the correct response is not 'we'll try' — it is to quote the controller upgrade as part of the work, or to decline the site.

If it is not a NetSure

On an Eltek Smartpack or Smartpack2 the equivalent parameters exist but carry different names, and the mapping has to be done before the quotation rather than during a commissioning window with the site already down. That mapping — plant by plant, controller by controller, firmware by firmware — is exactly what our compatibility audit produces and hands over signed.

Equipment this guide covers

Common questions about this family

Can I just unplug the temperature probe instead?

No. Unplugging a sensor usually raises an alarm and can drive the controller into a default behaviour you did not choose. Set the compensation sensor selection to None so the plant is configured for what is actually installed.

What else changes at the same time?

Float and equalize go to the same value, automatic equalize is disabled, thermal runaway management goes off, the string capacity is entered as Ah × number of modules, the charge current limit is enabled and set, and the low-voltage disconnect is placed at least 0.5 V above the battery's own disconnect. They are one change, not six independent ones.

Limitations

Parameter names follow the NCU menu at the time of writing and can change between firmware releases. This guide does not confirm that a given firmware version exposes the settings; that is read on the controller.

Sources

  1. Vertiv — DC power systems (NetSure platform), product documentation
  2. User manual of the installed controller, for the firmware version actually running (no public URL — cite by title)
  3. Datasheet of the specific rectifier module and of the specific battery model quoted (no public URL — cite by title)

Editorial and technical methodology →

Other guides

Before you buy a battery, find out what your plant can charge.

We document your rectifier, controller and firmware version and hand you a signed compatibility sheet. USD 450 per site — free for the first ten accounts.

Request a compatibility audit →