Vertiv R48-3500e3: specifications and which module replaces it
The R48-3500e3 is a 3500 W, −48 V DC Vertiv eSure rectifier (spec number 1R483500e3): 73 A maximum, full power from 176 to 305 VAC and up to +45 °C. It is not the same module as the R48-3500e — same rating, different body. Vertiv markets the R48-3500E4 as its backward-compatible replacement, but the E4 accepts 85–264 VAC, so on a 277 VAC feed it is not a like-for-like swap.
Key figures at a glance
| Parameter | Value | Where it comes from |
|---|---|---|
| Spec / model number | 1R483500e3 / R48-3500e3 | Vertiv R48-3500e3 manual |
| Output | −48 V DC nominal, positive ground; adjustable −42 to −58 V DC via the controller | Vertiv R48-3500e3 manual |
| Output power / current | 3500 W (73 A) at 208/220/230/240/277 VAC and −48 V DC | Vertiv R48-3500e3 manual |
| Current limit | Settable 0 to 73 A via the controller | Vertiv R48-3500e3 manual |
| AC input, nominal | 208 / 220 / 230 / 240 / 277 VAC, single phase, 50/60 Hz | Vertiv R48-3500e3 manual |
| AC input, permitted | 85–305 VAC; full 3500 W from 176 to 305 VAC; 1500 W at 85 VAC | Vertiv R48-3500e3 manual |
| Maximum input current | 21.0 A at 176 V (208/240 V nominal) · 15.7 A at 235 V (277 V nominal) | Vertiv R48-3500e3 manual |
| Efficiency | ≈95–96.5 % from 25 % to 100 % load (typical tables) | Vertiv R48-3500e3 manual |
| Temperature | Full power −40 to +45 °C; 3200 W at +50 °C; 2700 W at +65 °C | Vertiv R48-3500e3 manual |
| Altitude | 2000 m at full power; above that, derate 3 °C per 300 m up to 4000 m | Vertiv R48-3500e3 manual |
| AC protection | Low-voltage disable 80 V ±5 V · high-voltage disable 307.5 V ±2.5 V | Vertiv R48-3500e3 manual |
| Output fuses | Two 63 A fuses in the output, not customer replaceable | Vertiv R48-3500e3 manual |
| High-voltage shutdown | Adjustable 56–59 V DC via controller; backup 59.5 V ±0.5 V | Vertiv R48-3500e3 manual |
| Controller link / paralleling | CAN bus · up to 160 rectifiers in one system · active load sharing | Vertiv R48-3500e3 manual |
| Hot swap | Yes, insert or remove on a live DC system | Vertiv R48-3500e3 manual |
| Dimensions / weight | 42.0 × 84.5 × 330 mm (H × W × D) / 1.7 kg | Vertiv R48-3500e3 manual |
| Compliance (as stated by Vertiv) | EMC: ETSI EN 300 386, FCC Part 15 class B, GR-1089-CORE · Safety: IEC/EN 60950 | Vertiv R48-3500e3 manual |
e, e3 or E4: which one do you actually have?
Three Vertiv eSure modules carry "3500" in the name, and the front label is usually all a buyer searches. The body is what decides whether a module fits the shelf.
| R48-3500e | R48-3500e3 | R48-3500E4 | |
|---|---|---|---|
| Part number | 1R483500E | 1R483500e3 | 1R483500E4 |
| Body (H × W × D) | 132 × 85.3 × 217 mm | 42.0 × 84.5 × 330 mm | 41 × 84.5 × 330 mm |
| Weight | 3.5 kg | 1.7 kg | 1.9 kg |
| AC input, nominal | 200–277 VAC | 208–277 VAC | 200–250 VAC |
| AC input, permitted | 85–305 VAC | 85–305 VAC | 85–264 VAC |
| Max input current | 22.5 A | 21.0 A | 21 A |
| DC output range | −42 to −58 V | −42 to −58 V | −42 to −57.6 V |
| Output | 3500 W / 73 A | 3500 W / 73 A | 3500 W / 73 A |
| Peak efficiency | 96.3 % | ≈96.5 % (typical tables) | 98 % |
| Controller link | CAN bus | CAN bus | CAN bus |
| Fits an e3 shelf? | No: different body | — | Yes, per Vertiv |
e → e3 (or e3 → e): not a swap. The bodies differ in height and depth, so the shelf is different. A site with "e" modules needs "e" modules or a shelf change.
e3 → E4: Vertiv's E4 datasheet describes it as backward compatible and able to replace R48-3500E3 rectifiers. Before ordering, confirm the AC feed stays within 264 VAC and that the controller recognises the E4 (read the controller model and software version on its display).
Mixing e3 and E4 in one plant: the E4 datasheet describes mixing standard and high-efficiency rectifiers with ECO mode on the NetSure controller. We still confirm it against your controller version before quoting.
How the e3 behaves when the controller is lost
This is the question that matters on remote sites. Per Vertiv's manual:
- The factory default output voltage is 53.5 V.
- Once the controller recognises the module, the output moves to the voltage programmed in the controller.
- If communication with an SCU+ controller is lost, the module goes to a separate default voltage programmed into it.
- If communication with an ACU+ or NCU controller is lost, the module keeps the last float voltage it received.
On a lithium retrofit this is why the controller settings must be right before the swap: with an ACU+ or NCU controller, a module that loses the link stays at the last float value it was given (with an SCU+ it goes to its own programmed default voltage). See the 12-point lead-acid to lithium checklist.
Reading the LEDs before you order a replacement
| LED | State | Most common cause (Vertiv manual) |
|---|---|---|
| Green | Off | No AC input, or internal input fuse open |
| Green | Flashing | Controller is identifying the module |
| Yellow | On | AC input out of range, over-temperature, power derating, module not fully inserted, load-sharing imbalance, or ECO standby |
| Yellow | Flashing | Lost communication with the controller (module still supplies power) |
| Red | On | Output disabled (for example HVSD or internal output fuse open), severe sharing imbalance, address conflict |
| Red | Flashing | Fan not operating: the module shuts down; the fan is field replaceable |
A flashing red LED points to the fan, not necessarily a dead module. A yellow LED in summer heat can simply be thermal derating above +45 °C.
Before you change or add an e3
- Photograph the module label (model and spec number), not the cabinet brand.
- Photograph the controller display with its model and software version.
- Note the AC feed voltage (208 / 230 / 240 / 277 V): it decides whether an E4 is an option.
- After inserting a module, check the per-module current limit: the controller divides the total limit by the number of modules, and Vertiv warns not to set it so low that losing one module drops the limit below the load.
- If the site is moving from VRLA to lithium, follow the 12-point list before touching float, HVSD or current limit.
Not sure what the plant is? Identify your DC plant in two photos. The naming history is in Emerson R48-2900U vs Vertiv R48-2900U, and the wider family in Vertiv NetSure & Emerson R48 modules.
Need an R48-3500e3, an E4 or an e?
Send a photo of the module label and of the controller display, plus the AC feed voltage. We tell you in writing which module matches and whether an E4 is an option on your site. Source, availability and lead time are confirmed per request, never promised in advance.
Request a quotation → · Phone & WhatsApp: +971 58 829 2878
Equipment this guide covers
Common questions about this family
What is the difference between the R48-3500e and the R48-3500e3?
Same 3500 W and 73 A rating, different module. The e is 132 mm tall and 217 mm deep; the e3 is 42 mm tall and 330 mm deep. They are not interchangeable in the same shelf.
Can the R48-3500E4 replace an R48-3500e3?
Vertiv's E4 datasheet says it is backward compatible and replaces R48-3500E3 rectifiers. Check that your AC input is within the E4's 85–264 VAC range and that your controller recognises it.
Does the R48-3500e3 work on 277 VAC?
Yes. 277 VAC is one of its nominal inputs (Vertiv notes 277 VAC applies to the e3 only), with a permitted range up to 305 VAC.
What is the R48-3500e3 output current?
73 A at −48 V DC, 3500 W. The current limit is adjustable from 0 to 73 A through the controller.
Why is my R48-3500e3 giving less than 3500 W?
It derates above +45 °C ambient (3200 W at +50 °C, 2700 W at +65 °C) and below 176 VAC input (1500 W at 85 VAC). The yellow LED lights when it is derating.
What does the flashing red LED mean on an R48-3500e3?
The fan has stopped and the module has shut down. The fan is field replaceable.
Is the R48-3500e3 hot swappable?
Yes. Vertiv rates it for insertion or removal on a live DC system.
What is the part number of the R48-3500e3?
The spec number is 1R483500e3. The R48-3500e is 1R483500E and the E4 is 1R483500E4: quote the full number when you ask for a price.
Limitations
This page reproduces manufacturer figures from Vertiv's own manual and datasheets. It does not state which NetSure system or shelf a given site uses, and it does not guarantee that a module will be recognised by a particular controller version: that is read per site from the label and controller photos.
Sources
- Vertiv — eSure Rectifier Module User Manual, R48-3500e3 (spec. no. 1R483500e3), Rev B
- Vertiv — eSure Rectifier R48-3500e datasheet (2017.03)
- Vertiv — eSure Rectifier R48-3500E4 datasheet (R02/2021)
Editorial and technical methodology →
Other guides
- Is the Emerson R48-2900U the same as the Vertiv R48-2900U?
- Can I mix R4850G2 and R4875G1 modules in the same shelf?
- What float voltage do I set for lithium on a Flatpack2?
- Can I put a 51.2 V rack battery in my −48 V telecom plant?
- How do I disable temperature compensation on a NetSure controller?
- Is the Eltek Flatpack2 discontinued?
- Where do I set the low-voltage disconnect on a lithium retrofit?
- What paperwork does a telecom lithium battery need to ship?
- How do I identify my 48 V DC plant?
- Does my controller need a firmware update before a lithium retrofit?
- How does a lithium BMS talk to a telecom DC plant?
- How do I size a lithium bank to replace my VRLA string?
- Does the grounding scheme change when I retrofit a −48V plant to lithium?
- Can I reuse the old breaker when I swap VRLA for lithium?
- Can a VRLA string and a lithium string run in parallel during a migration?
- Can I switch my −48 V plant from lead-acid to lithium? The 12-point checklist
- Is the 48 V in AI data centers the same as telecom −48 V?